Using Crane Resource

Loading video please wait.
From the Eco3D Component Library load an Energy Meter and a switch. Set the start time in the switch to 00:00:00 and the end time to 24:00:00.

From the Inline category load a “Basic Feeder” and Conveyor component.

Load the resource manager component.

Load an InLet component and PnP to the “Basic Feeder”, then load an Outlet component and PnP to the conveyor component.

Load the Crane from the Resources category. Make sure that the “Basic Feeder” and Conveyor are within the work envelope of the Crane. On the Param tab of the crane component disable the parameter “UseOperator”.

When the simulation runs the Crane will pick up a dynamic component from the “Basic Feeder” and then transport the component to the conveyor.